Barbara and Jack Davis Hall
Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from New York State funding and the rest from corporate and individual endowments.[3][5] Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers.[5]
Barbara and Jack Davis Hall | |
---|---|
<mapframe zoom="13" frameless="1" align="center" longitude="-78.787145" latitude="43.002795" height="200" width="250">{"type":"Feature","geometry":{"coordinates":[-78.787145,43.002795],"type":"Point"},"properties":{"title":"Barbara and Jack Davis Hall","marker-color":"#5E74F3"}}</mapframe> | |
General information | |
Type | Educational, Research Center |
Location | North Campus, Amherst, New York |
Coordinates | 43°00′10″N 78°47′14″W / 43.002795°N 78.787145°W |
Current tenants | UB Engineering Department of Computer Science and Engineering Department of Electrical Engineering Center of Excellence for Document Analysis and Recognition (CEDAR) Center for Unified Biometrics and Sensors(CUBS) |
Groundbreaking | May 2009 |
Completed | Late 2011 |
Opened | May 10, 2012 [2] |
Cost | $75 million (2010 dollars) |
Client | State University of New York[1] |
Owner | University at Buffalo |
Technical details | |
Floor count | 3, plus penthouse [1] |
Floor area | 130,000 sq ft (12,000 m2) [1][3] |
Design and construction | |
Architect(s) | Robert Goodwin[2] |
Architecture firm | Perkins and Will[1][3] |
Main contractor | Turner Construction[1] |
Awards and prizes | LEED Gold Certificate [1][4] |
Website | |
Davis Hall |
The building is constructed by Turner Construction and its exterior design is a reminiscent to printed circuit board representing interaction among faculties and students and is designed by Perkins and Will firm.[2] The building is constructed in accordance with LEED's Gold certificate standards.[2]
Naming
The building is named after industrialist-turned-political candidate Jack Davis and his wife Barbara, who made the largest endowment ($5 million) among individuals to fund the project.[2] The couple made their first donation of $1.5 million to fund the project in 2008.[3] Jack, a UB Engineering graduate in 1955,[4] and his wife donated an additional $3.5 million to the project making themselves the people who have made the largest endowment in university's history with $5 million endowment.[3]
Tenants
Departments
The building is the new home to Computer Science and Electrical Engineering departments.[2] However, the building supports five other departments such as Mechanical and Aerospace Engineering, Biomedical Engineering, Civil, Structural and Environmental Engineering, Industrial and Systems Engineering and Chemical and Biological Engineering.[4]
Labs
Notable features
Facilities and research centers
- 5,000 sq ft (460 m2) of Cleanroom space[1]
- Two 3D Electrical Engineering Labs [1]
- A smart room [1]
- A surgery lab [1]
- A multimedia lab [1]
- A security lab [1]
- Two visualization labs [1]
- Eleven flexible, multi-purpose labs [1]
- Center of Excellence for Document Analysis and Recognition (CEDAR)[6]
- Center for Unified Biometrics and Sensors (CUBS)[7]
LEED gold certificate
On April 4, 2012 it was announced that the building has been certified "Gold" by LEED.[4] The building exceeds the state's energy efficiency code by 34 percent. Some of its features, making the building green, are as follow:
- An outdoor plaza that includes water-efficient landscaping and methods to capture stormwater
- A small green roof
- Waterless urinals
- Bicycle racks
- Constructed with recycled building materials
- Energy-efficient heating, cooling and ventilation systems
References
- ^ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 "Turner Construction Davis Hall project". Archived from the original on 2016-12-20.
- ^ 2.0 2.1 2.2 2.3 2.4 2.5 "Davis Hall ribbon-cutting".
- ^ 3.0 3.1 3.2 3.3 3.4 "Davis Hall Building". Archived from the original on 2013-12-24. Retrieved 2013-05-30.
- ^ 4.0 4.1 4.2 4.3 "Davis Hall earns LEED gold for eco-friendly features".
- ^ 5.0 5.1 "New UB Engineering Building". Archived from the original on 2013-06-07.
- ^ Center of Excellence for Document Analysis and Recognition (CEDAR)
- ^ Center for Unified Biometrics and Sensors (CUBS)