Kengeri Bus Terminal metro station
Namma Metro's Purple Line metro station
Kengeri Bus Terminal is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. It is one of the most important metro stations since it holds the Kengeri Bus Terminus in the suburban city of Kengeri. It was inaugurated on 29 August 2021 and commenced to the public on 30 August 2021.[1][2]
Kengeri Bus Terminal | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||
![]() A metro station connecting the Kengeri Bus Terminal | |||||||||||
General information | |||||||||||
Other names | Kengeri Bus Station, Kengeri TTMC | ||||||||||
Location | Kengeri bus terminal Metro Station Mailasandra, Mailasandra, Bengaluru, Karnataka 560060 | ||||||||||
Coordinates | 12°54′54″N 77°29′15″E / 12.914897547311018°N 77.48759284335294°E | ||||||||||
Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | ||||||||||
Operated by | Namma Metro | ||||||||||
Line(s) | Purple Line | ||||||||||
Platforms | Side platform Platform-1 → Whitefield (Kadugodi) Platform-2 → Challaghatta | ||||||||||
Tracks | 2 | ||||||||||
Connections | ![]() | ||||||||||
Construction | |||||||||||
Structure type | Elevated, Double track | ||||||||||
Platform levels | 2 | ||||||||||
Parking | ![]() | ||||||||||
Other information | |||||||||||
Status | Staffed | ||||||||||
Station code | MLSD | ||||||||||
History | |||||||||||
Opened | 30 August 2021 | ||||||||||
Electrified | 750 V DC third rail | ||||||||||
Services | |||||||||||
| |||||||||||
|
Station layout
Kengeri Bus Terminal track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Eastbound |
Towards → Whitefield (Kadugodi) Next Station: Pattanagere | |
Platform 2 Westbound |
Towards ← Challaghatta Next Station: Kengeri | |
Side platform | Doors will open on the left | ||
L2 |
Entry/Exit
There are 2 Entry/Exit points - A and B. Commuters can use either of the points for their travel.
- Entry/Exit point A - Towards Kengeri side
- Entry/Exit point B - Towards Kengeri side
See also
References
- ^ "Kengeri metro line inaugurated, commercial operations from August 30". The Hindu. 29 August 2021. ISSN 0971-751X. Retrieved 29 August 2021.
- ^ "Bengaluru Metro: 7.5-km Purple line from Mysore Road to Kengeri inaugurated". www.timesnownews.com. Retrieved 29 August 2021.