Slieve Rushen Wind Farm
Power generation facility in County Fermanagh, Northern Ireland
![]() | The topic of this article may not meet Wikipedia's notability guideline for geographic features. (January 2022) |
Slieve Rushen Wind Farm is an 18-turbine wind farm in County Fermanagh, Northern Ireland, with a total capacity of 54 MW, enough to power over 30,000 homes.[1] It was commissioned in April 2008.[1]
Slieve Rushen Wind Farm | |
---|---|
<mapframe zoom="5" frameless="1" align="center" longitude="-7.62" latitude="54.16" height="200" width="300">{"type":"Feature","geometry":{"coordinates":[-7.62,54.16],"type":"Point"},"properties":{"marker-color":"#5E74F3","title":"Slieve Rushen Wind Farm","marker-symbol":"industrial"}}</mapframe> | |
Country | Northern Ireland, United Kingdom |
Location | County Fermanagh |
Coordinates | 54°09′36″N 07°37′12″W / 54.16000°N 7.62000°W |
Status | Operational |
Construction began | July 2007 |
Commission date | April 2008 |
Construction cost | £900,000 |
Operator(s) | B9 Energy |
Wind farm | |
Type | Onshore |
Power generation | |
Nameplate capacity | 54 MW |
Annual net output | 135 GWh |

See also
Lua error in mw.title.lua at line 346: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
References
- ^ 1.0 1.1 UK Operational Wind Farms – Renewable UK Archived 2011-10-01 at the Wayback Machine Accessed 5 October 2011