Capitol station (Caltrain)
Capitol | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Capitol station in September 2012 | ||||||||||||||||
General information | ||||||||||||||||
Location | 3400 Monterey Road San Jose, California | |||||||||||||||
Coordinates | 37°17′02″N 121°50′30″W / 37.28389°N 121.84167°W | |||||||||||||||
Owned by | Peninsula Corridor Joint Powers Board | |||||||||||||||
Line(s) | UP Coast Subdivision[1] | |||||||||||||||
Platforms | 1 side platform | |||||||||||||||
Tracks | 1 | |||||||||||||||
Connections | ![]() | |||||||||||||||
Construction | ||||||||||||||||
Parking | 379 spaces | |||||||||||||||
Bicycle facilities | 12 racks and 24 lockers | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Fare zone | 5 | |||||||||||||||
History | ||||||||||||||||
Opened | July 1, 1992[2] | |||||||||||||||
Passengers | ||||||||||||||||
2018 | 78 per weekday[3] ![]() | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
|
Capitol station is a Caltrain station located off Monterey Road near the Capitol Expressway, after which the station is named, in southern San Jose, California. The station is only served during weekday peak hours, with northbound trains in the morning and southbound trains in the evening. Service between San Jose and Gilroy, including Capitol station, was increased to four weekday round trips on September 25, 2023.[4]
The Communications Hill residential neighborhood, located just to the west, has no direct pedestrian access to the station. There are plans to construct a pedestrian bridge to link the station to the neighborhood.[5]
See also
- Capitol station (VTA) - VTA light rail station 2 miles (3.2 km) away also named for Capitol Expressway
References
- ^ SMA Rail Consulting (April 2016). "California Passenger Rail Network Schematics" (PDF). California Department of Transportation. p. 13.
- ^ Duncan, Mark (October 4, 2005). "The San Francisco Peninsula Railroad Passenger Service: Past, Present, and Future" (PDF). pp. 18, 91. Archived from the original (PDF) on October 18, 2018.
- ^ Caltrain. "2017 Annual Count Key Findings Report" (PDF). Archived from the original (PDF) on 2018-07-01. Retrieved 2018-01-29.
- ^ "Caltrain to Operate New Schedule Starting this Fall" (Press release). Peninsula Corridor Joint Powers Board. September 13, 2023.
- ^ "Appendix C: Communications Hill Specific Plan Area Development Policy". Communications Hill 2 Project: Final Environmental Impact Report. City of San Jose. August 2014.
External links
Media related to Capitol station (Caltrain) at Wikimedia Commons
- Caltrain - Capitol
Categories:
- Short description with empty Wikidata description
- Coordinates not on Wikidata
- Infobox mapframe without OSM relation ID on Wikidata
- Commons category link is the pagename
- Caltrain stations in Santa Clara County, California
- Railway stations in San Jose, California
- Railway stations in the United States opened in 1992
- Santa Clara County, California railway station stubs
- San Jose, California building and structure stubs