Goindwal Sahib Power Plant
Goindwal Sahib Power Plant | |
---|---|
<mapframe zoom="5" frameless="1" align="center" longitude="75.15" latitude="31.383333333333" height="200" width="300">{"type":"Feature","geometry":{"coordinates":[75.15,31.383333333333333],"type":"Point"},"properties":{"marker-color":"#5E74F3","title":"Goindwal Sahib Power Plant","marker-symbol":"industrial"}}</mapframe> Location of Goindwal Sahib Power Plant in Punjab | |
Country | India |
Coordinates | 31°23′N 75°09′E / 31.383°N 75.150°E |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Nameplate capacity | 540 MW |
External links | |
Website | https://www.gvk.com |
Goindwal Sahib Power Plant is a coal-based thermal power plant located at Goindwal Sahib in Tarn Taran district in the Indian state of Punjab. The power plant is operated by the GVK Group.
The coal for the power plant will be sourced from Tokisud and Seregarha coal mines in state of Jharkhand.[1]
Capacity
The planned capacity of the power plant is 540 MW (2x270 MW).[2]
Stage | Unit Number | Capacity (MW) | Date of Commissioning |
---|---|---|---|
1st | 1 | 270 | 1 April 2016 [3] |
1st | 2 | 270 | 14 April 2016 |
References
- ^ "GVK | Our Business - Enegry - Thermal". www.gvk.com.
- ^ "GVK wants to sell Punjab unit to NTPC - 335954 - 2014-04-02". Archived from the original on 5 June 2014. Retrieved 20 April 2014.
- ^ "BHEL commissions 270 MW Thermal Unit in Punjab". www.indiainfoline.com.
Lua error in mw.title.lua at line 346: bad argument #2 to 'title.new' (unrecognized namespace name 'Portal').
Categories:
- Pages with script errors
- Short description with empty Wikidata description
- All Wikipedia articles written in Indian English
- Infobox mapframe without OSM relation ID on Wikidata
- Coordinates not on Wikidata
- Coal-fired power stations in Punjab, India
- Tarn Taran district
- 2016 establishments in Punjab, India
- Energy infrastructure completed in 2016
- Indian power station stubs