Vilnius Biofuel Power Plant
Vilnius Biofuel Power Plant | |
---|---|
![]() 2022 | |
<mapframe zoom="5" frameless="1" align="center" longitude="25.156666666667" latitude="54.667777777778" height="200" width="300">{"type":"Feature","geometry":{"coordinates":[25.156666666666666,54.66777777777777],"type":"Point"},"properties":{"marker-color":"#5E74F3","title":"Vilnius Biofuel Power Plant","marker-symbol":"industrial"}}</mapframe> | |
Official name | Vilniaus kogeneracinė jėgainė |
Country | Lithuania |
Location | Vilnius |
Coordinates | 54°40′4″N 25°9′24″E / 54.66778°N 25.15667°E |
Status | Operational |
Construction began | 2016 |
Commission date | 2021 |
Construction cost | 340 million €[1] |
Owner(s) | Ignitis grupė |
Thermal power station | |
Primary fuel | Waste |
Secondary fuel | Biofuel |
Power generation | |
Nameplate capacity | 88 MW (electricity) 227 MW (heat) |
Vilnius Biofuel Power Plant is a waste-to-energy plant in Vilnius, Lithuania.[2][3] The plant produces 40% of all annual heating requirements for the city of Vilnius.[1]
It was built next to decommissioned Vilnius Combined Heat and Power Plant and utilises some of the infrastructure.
References
External links
Categories:
- Infobox mapframe without OSM relation ID on Wikidata
- Coordinates not on Wikidata
- Energy infrastructure completed in 2021
- 2021 establishments in Lithuania
- Cogeneration power stations in Lithuania
- Power stations in Vilnius
- Biofuel power stations in Lithuania
- Waste power stations in Lithuania
- Power station stubs
- Lithuanian building and structure stubs